In job costing, the cost of spoiled work that is normal and arises because of the exacting specifications of a particular job should be:
Test yourself: pick an answer
Reveal answer & explanation
Correct answer: C) Charged to that particular job
Explanation
Where spoilage is caused by the special requirements of a specific job, it is part of the cost of that job and is charged to it (net of any scrap value). Normal spoilage common to all jobs is included in production overheads, while abnormal spoilage is written off to the Costing Profit and Loss Account.
More Unit, Batch and Job Costing MCQs
- Q8A batch of 500 units incurred direct material ₹42,000, direct labour ₹28,000 and set-up cost ₹6,000. Production overheads are absorbed at…
- Q9The cost of rectifying normal defective work which cannot be identified with any particular job should be treated as:
- Q1Unit (single or output) costing is most suitable for:
- Q2Annual demand for a part is 36,000 units. Set-up cost per production batch is ₹1,500 and the cost of carrying one unit in stock for a year…
- Q3For the same part (annual demand 36,000 units, set-up cost ₹1,500 per batch, carrying cost ₹12 per unit per annum), the total annual…